skip to content link

What Affects the Cost of a Laboratory Move (and How to Get an Accurate Quote)

The cost of a laboratory move depends far more on scope than distance. The biggest drivers are the number and type of items, the volume of chemicals and temperature-sensitive materials, building access at both sites, rigging, storage, phasing, and timing. Because these factors vary so much from one lab to the next, an accurate price requires an inventory and a site survey. Square-footage estimates rarely hold up for lab moves.

The Main Cost Factors in a Lab Move

Cost factorWhy it affects the priceWhat tends to raise it
Equipment inventoryEach instrument needs preparation, packing, and handlingHigh-value or fragile instruments that need custom crating
Chemical volumeChemicals must be inventoried, segregated, and packed for transport under DOT rulesLarge or poorly inventoried chemical stocks
Temperature-sensitive materialsSamples and reagents need dedicated cold transport and monitoringMany freezers, tight temperature limits, long transit times
Building accessLabor time depends on elevators, docks, and distance from dock to labShared docks, small elevators, restricted move hours
RiggingHeavy or oversized items need specialized gear and planningItems that exceed elevator or floor limits
StorageStorage adds a second transport leg and extra handlingOpen-ended buildout delays
PhasingEach phase is a separate mobilization of crews and trucksMany small phases instead of a few large ones
TimingOff-hours work protects research schedules but costs more in laborWeekend, overnight, or compressed schedules
DocumentationInventories, chain-of-custody records, and COIs take time to prepareStrict procurement or compliance reporting requirements

For more detail on specific factors, see our guides to what a lab rigging plan includes, lab storage during buildout delays, and safe transport of laboratory chemicals.

What a Lab Moving Quote May Not Include

Other vendors often handle parts of a lab relocation, and their costs sit outside the mover's quote. Confirm who is responsible for each of these before comparing bids:

  • OEM service: disconnecting, reinstalling, and requalifying instruments
  • Certification: recertifying biosafety cabinets and other equipment after relocation
  • Utility work: electrical, plumbing, gas, and exhaust disconnects and reconnects by licensed trades
  • Decontamination: cleaning and decontaminating equipment before it moves
  • Waste disposal: removing expired or unwanted chemicals through a licensed disposal vendor

What to Include in a Quote Request or RFP

The more complete your quote request, the fewer changes you will see later. Include:

  • Both addresses, target move dates, and the date the new space must be operational
  • An equipment inventory with make, model, and room location, plus dimensions and weight for large items
  • A chemical inventory summary, including approximate volume and hazard classes
  • The number of freezers, refrigerators, and other cold storage units, with their temperature requirements
  • Building details for both sites: elevator capacity, dock access, permitted move hours, and COI requirements
  • Critical equipment and the maximum downtime your research can tolerate
  • Any storage needs if the new space may not be ready
  • Who will handle OEM service, decontamination, utility disconnects, and disposal
  • Procurement requirements: insurance limits, vendor onboarding forms, payment terms, and the response format you need

Why a Site Survey Improves Quote Accuracy

A site survey is a walkthrough of both locations before finalizing the quote. It catches what inventories miss: equipment stored in shared rooms, tight turns on the route, elevator limits, and dock rules. It also gives the moving team a chance to identify rigging items and cold storage needs early.

Common Causes of Change Orders

Most cost changes after a quote come from missing or changed scope. Watch for these:

  1. Equipment added after the quote, often from storage rooms or shared spaces
  2. Building restrictions discovered late, such as new dock hours or elevator outages
  3. Move date changes that require crews to be rescheduled
  4. A destination space that is not ready, which turns a direct move into a storage move
  5. A chemical inventory that is incomplete on packing day
  6. Equipment that is not decontaminated or disconnected when the crew arrives

How to Compare Lab Moving Quotes

Compare scope line by line, not just the total. Check each quote's assumptions, exclusions, insurance and valuation terms, and how changes will be priced. A lower total that excludes chemical packing or after-hours work is not a lower price. Our article on choosing the right lab moving company covers the qualifications to compare alongside price.

When to Start Requesting Quotes

Start early. In a Lab Manager roundup of relocation advice, George Rohlfing, president of Labmovers.com, recommended engaging a lab relocation company six to 12 months before your go-live date. Early quotes give you time to budget, gather inventories, and line up other vendors. Our 6-month laboratory relocation checklist shows what to do at each stage.

Get an Accurate Quote

Ready to price your move? Request a lab moving quote and include your equipment list and building details so we can scope the project accurately.

Topics:
Call Icon